906 Model's Finising Work After Blowing

Blown end joist(Rear door)
1.D/S end joist
2.blown end joist foam and cover plastic
Blown end joist(fron door)
1.D/S end joist
2.blown end joist foam and cover plastic
Box
1.foam resistive panner
Wall gap
1.R19 gaps
2.foam gaps
under stairs
1.Cover plastic concrete wall(bottom)
under stairs(no basement)
1.Cover plastic wall
D/S Ducts
1.R19 just ducts
Stail wall(basement)
1.R19 wall
2.Cover plastic
D/S Joist of basement
Blown basic1
1.Cut gas valve(mechanical room)
Blown basic2
1.Cut drain pipes
2.Cut concent
3.Cut Duct
Blown basic3
1.Cut drain pipes
Blown basic4
1.foam resistive pannel
Blown basic5
1.R19 joist

CAUTION

1. Checkup Foam & gap of walls
2. Checkup Cutting Pipes & Electrical Concents into all walls