904 Model's Finising Work After Blowing
Stair Box 1.Cover plastic(5 studs) |
|
---|---|
Stair wall(no basement) 1.Cover plastic |
|
Water pipes Box 1.Cover plastic |
|
Steel post 1.Cover plastic bothside and top |
|
under Box 1.Cover plastic top and bottom ceiling |
|
Stair wall(basement) | |
End joist(basement) | |
Blown basic1 1.Cut concent 2.Cut gas valve |
|
Blown basic2 1.Cut drain pipes 2.Cut concent 3.Cut Duct |
|
Blown basic3 1.Cut drain pipe |
|
Blown basic4 1.foam resistive pannel |
|
Blown basic5 1.R19 FSK(Foil) Joist |
|
CAUTION |
1. Checkup Foam & gap of walls 2. Checkup Cutting Pipes & Electrical Concents into all walls |