903 Model's Finising Work After Blowing

under stair(no basement)
1.cover plastic
Restroom wall(front)
1.cover plastic
End Joist(Front & Rear)
1.cover batt
2.foam gaps
3.cover plastic
Stair wall(basement)
1.Cover plastic
End joist(basement)
1.R19 FSK(Foil) end joist and joist
Blown basic1
1.Cut gas valve(mechanical room)
Blown basic2
1.Cut drain pipes
2.Cut concent
3.Cut Duct
Blown basic3
1.Cut drain pipes
Blown basic4
1.foam resistive pannel
Blown basic5
1.R19 joist

CAUTION

1. Checkup Foam & gap of walls
2. Checkup Cutting Pipes & Electrical Concents into all walls